Here are some pictures of the railway sleeper vegetable beds we constructed for my mother. It took two of us about one & a half days. The work was quite tiring (not used to digging!) & involved mainly soil removal, moving & levelling of the railway sleepers, rather than the actual cutting and fixing which was relatively quick and simple.
USEFUL TOOLS:
Spirit level (Crucial)
Lump hammer (for those minor adjustments)
Cordless drill (to screw the Timberlok in)
Chainsaw (or circular saw)
Spade (narrower the better)
PRODUCTS:
new pine railway sleepers
Timberlok screws (8" & 6")
The Deacon Family
RAILWAY SLEEPERS USED:
New Pine railway sleepers


















































