See attached a few photos of the project I have been working on for the last few days - raised bed from new oak railway sleepers, gravel path and area for composter, and steps (oak railway sleeper and gravel). Alot of digging required, plus 26 by 1.2 m and 3 by 1.8 m new oak railway sleepers. In total I used 750 kg sub base and 1000kg Trent 20mm gravel for the paths, and 250kg pea gravel for the foundations of the raised bed. The railway sleepers in the steps were laid on 100kg post-crete which worked well. All in all a good job - now waiting to source some cream boulders to finish off the right hand side.
Simon Page, Bingham, Nottinghamshire
RAILWAY SLEEPERS USED:
New oak railway sleepers